Deep Dig-it

Test program of the Deep Dig-it, an excavator that digs a transport cable at a depth of 5 meters for the wind farm at sea. These export cables run from sea to land. The test starts in the Alexiahaven.
Source: Port of Rotterdam
Test program of the Deep Dig-it, an excavator that digs a transport cable at a depth of 5 meters for the wind farm at sea. These export cables run from sea to land. The test starts in the Alexiahaven.
Source: Port of Rotterdam